Problems this route should solve.
- The inspection task needs a system route instead of one camera part number
- Lighting, lens and trigger choices change the pass/fail result
- The buyer needs RFQ evidence before selecting a machine vision supplier
Inspection solution
Plan a complete vision inspection system for defect checks, presence, measurement, barcode reading and pass/fail output.
Run the machine vision workflow demo to follow a sample image from input through processing to a pass/fail result.
Before the system quote
Choose the route that matches the job. These are inputs and acceptance questions for a buyer and engineer to agree, not measured results or a promise that one configuration covers every task.
Swipe horizontally to compare the sample, capture, output and evidence requirements.
| Inspection goal | Good / NG / borderline samples | FOV and line speed | Required output | Acceptance evidence |
|---|---|---|---|---|
| Presence or surface defect | Good, known NG and borderline parts under normal surface variation. | State the full field of view, working distance, maximum line speed and trigger window. | Define the pass/fail signal and when a reject must reach the line. | Agree the sample count and limits for missed defects and false rejects before testing. |
| Dimension or position | Reference dimensions or positions, known out-of-tolerance parts and edge cases. | State both FOV axes, part-height variation, line speed and calibration setup. | Define the measurement value or position result and its receiving system. | Compare results with a reference method and record repeatability across the operating range. |
| Barcode or traceability | Readable, no-read, wrong-code and borderline print or mark examples. | State code size, material finish, working distance, motion and lighting limits. | Define decoded data, no-read handling and any reject or traceability record. | Test data correctness separately from decode success; request a separate standard-based test if code grading is required. |
Prepare the RFQ checklist, agree the acceptance test and review an illustrative inspection selection route before choosing components.
Application selection example
Solution RFQ
Send part images, line speed, inspection tolerance and current failure mode. We will map it to a component route.
Request engineering RFQSolution FAQ
No. Validate the station's fixture, operating modes, recipe selection, controller handoff, reject behavior and recovery with identified parts. A camera image alone does not accept the complete process.
No. Define observable presence or defect criteria, independent dimensional references and code-data correctness separately. Then test their combined timing and part disposition.
Define generation and event identity, invalidate stale transactions and verify recipe state before new results are released. Restored communication alone does not confirm the disposition of an earlier part.